Estimate final counts for recent, incomplete weeks using
baselinenowcast. The last
max_delay weeks are replaced; earlier observations are unchanged.
Downward revisions are redistributed with
baselinenowcast::preprocess_negative_values().
Arguments
- x
An
insightcast_dataobject with revision history.- max_delay
Number of recent weeks to nowcast. Defaults to
2.- draws
Number of posterior samples. Defaults to
1000.- prop_delay
Proportion of reference times used to estimate delays. Must be between 0 and 1. Defaults to
0.5.- scale_factor
Multiplier applied to
max_delayto set the estimation window. Defaults to3.
Value
An insightcast_ncast object with the shared backbone
(key, target, window, interval,
history) plus:
- data
Corrected series with
ncast_lowerandncast_upper95% credible interval bounds.- meta
Nowcast settings and a per-series
ncast_summary.
