Each dated row has its own zero baseline. Lines stay on their observation dates: follow a date vertically to see how its correction develops. The epidemic curve above uses the same horizontal calendar.
━━ Actual revision┄┄ Model's predicted revision━━ Final reference curve (upper panel)● Newest-week nowcast (upper panel)
Hover or click a point for the report, model nowcast, final reference, and their differences.